
A smart city being built from a blank map — and a plain-spoken guide to buying land in it, without the hype.
- India's First
Greenfield Smart City - DMIC
Connectivity - Long-Term
Growth Potential
About Dholera
A city imagined.
A future taking shape.
Most cities grow by accident. Dholera is being drawn first — every road, duct, canal and park placed on a plan before the first resident arrives.
Follow the roadmap920 km²
Special Investment Region
22
Villages folded into the plan
109 km
Ahmedabad–Dholera Expressway
₹91,000 Cr
Announced semiconductor fab
On the ground
The plan. The land.
The bigger picture.
Look beyond the master plan. Explore the region’s infrastructure, open landscapes and the work already taking shape.




Images: Wikimedia Commons · CC BY-SA 3.0/4.0, CC BY 3.0 · Respective authors.
Built with intent
What makes
the plan different.
A closer look at the foundations of a city designed from the ground up.
Understand before you investA city drawn first
India's first greenfield smart city, planned zone by zone — residential, commercial, industrial and green — inside the Delhi–Mumbai Industrial Corridor.
Roads, rail & runway
A dedicated expressway to Ahmedabad, a greenfield international airport and proposed rail and metro links tie Dholera into the national grid.
Industry as the anchor
Semiconductor, electronics, solar and manufacturing projects have been announced — jobs that eventually need homes, shops and services.
Utilities underground
Utility ducts, storm-water drains, water and power networks and ICT cabling are designed city-wide, not patched in later.
Room to breathe
Wide boulevards, green belts and a coastal location on the Gulf of Khambhat keep density low and the city open.
The roadmap
From a vision
to a neighbourhood.
A city is built in chapters. Here’s how the plan is unfolding.
- 2009
DMIC & Dholera SIR notified
The Gujarat government designates the Dholera Special Investment Region.
- 2015
Master plan takes shape
Town Planning Schemes define roads, zones and public land across the region.
- Next chapter
Activation area builds out
The first ~22 km² gets trunk infrastructure — roads, power, water, drainage.
- Next chapter
Airport, fab & expressway
Large anchor projects drive the next phase of demand. Timelines can slip — verify current status.

A little clarity goes a long way.
Dholera
Plot Buyer’s
Guide
The investment guide
Your first step.
A better understanding.
Before you pay a token, know what to check, what to ask and when to walk away. A short, honest guide.
- Reading the master plan & TPS numbers
- Land categories and zones, decoded
- A 7-point legal due-diligence checklist
- Budget, costs and the 5–10 year horizon
- Mistakes that cost first-time buyers